background

Production

DaehyunST manufactures 500,000㎡under strict QC system per day.

DaehyunST has largest manufacturing facility in Korea, we are studying customer's needs and trying to provide high quality product to customers to meet their satisfaction through Construction of Optimal Production Systems and Site Improvement.


Manufaturing process

STEP.1

Warehousing Base Film

The process of receiving/forwarding base film

STEP.2

Mixing process

Use Dissolver and Input the weighed raw materials Mix and Distribute

STEP.3

Adhesion Coating

After applying the adhesive to the Film, Liner winding and lamination

STEP.4

Processing process

Coating products are slitting/cutting/winding by specification

STEP.5

Inspection

Inspect product appearance and thickness

STEP.6

Delivery

Delivery to customer


Facility possession status(Domestic corporation)

Production Equipment
Coating Machine 19Line
Micro-Gravure 14EA
Slot-Die 5EA
Comma-Head 11EA
UV exposure M/C 3EA
Laminating M/C 1EA
Dissolver 22Line
Cutting Equipment
Slitting M/C 17Line
Auto-Cutting M/C 9Line
Die Cutting M/C 5Line
Precision Slitting M/C 5Line
Rewingding M/C 5Line


Facility possession status(Vietnam corporation)

Production Equipment
Coating Machine 9Line
Micro-Gravure 8EA
Slot-Die 3EA
Comma-Head 4EA
UV exposure M/C 2EA
Dissolver 11Line
Cutting Equipment
Slitting M/C 9Line
Auto-Cutting M/C 2Line
https://www.linkedin.com/company/daehyunst
https://www.youtube.com/@daehyunst_en
https://www.instagram.com/daehyunsthq
https://www.facebook.com/daehyunst6034/